BOM (Bill of Materials) and BOQ (Bill of Quantities) are essential documents in construction projects that help manage and track the materials, quantities, and costs associated with a construction project. Add BOM/BOQ tool in Krion 6D enables you add attach these documents related to a project. BOM/BOQ tool is available under the attachments in
Note: The items displayed in the BOM/BOQ list can also be customized by selecting the columns drop-down menu. Search bar allows to search for a particular BOM/BOQ.
Allows a BOM/BOQ list to be uploaded/downloaded as an Excel.
6. Click on to add a new BOM/BOQ
7. In the Add BOM/BOQ fill in the details as mentioned
· Parent BOM can be selected for review which is related to the current BOM being created. This field is optional
· BOM Code needs to be entered 0001-XXXX-XX01-BOM-0001-A-P01.01 in the required format which breaks down into these components:
o 0001: A unique identifier for the BOM/BOQ being created
o XXXX: The code representing the organization.
o XX01: Alpha Numeric Code for the current phase of the project.
o BOM: Implies that it is a BOM/BOQ
o 0001: The code for the department.
o A: The department revision identifier Viz., A - Architectural, C-Civil, S-Structural, M-Mechanical, P-Plumbing, E-Environmental etc.,
o P01: Revision Number
o 01: A suffix indicating that the issue is currently a work in progress
This format ensures that each BOM/BOQ can be tracked and referenced efficiently throughout its workflow process.
· Enter the BOM item Name
· Select and assign a workflow for the and set the priority.
· Select the Unit of the material and Enter the Quantity
· Enter the Rate per unit In Figures and In Words and the Total
· Optionally enter Remarks and GUID if required
· Finally Attach the QR code file of the BOM/BOQ for reference.
After filling all the mandatory fields marked in red, click on to successfully create a BOM/BOQ. Once a BOM/BOQ is created people in the workflow will get notified through an email.